Plan charging that respects owner rights, protects shared walkways, and fits the building’s electrical capacity. A practical guide for residents and association boards.

Charging outside a unitInstallation checklist

Florida protects qualifying owner installations

Under § 718.113(8), a board cannot prohibit an owner’s qualifying charger within the owner’s limited common element or exclusively designated parking area. The protection is subject to statutory conditions.

Electricity must be separately or embedded-metered and paid by the owner. The owner bears installation, operation, maintenance, repair, insurance, and eventual removal costs. The law allows genuine safety requirements and reasonable architectural standards that do not prohibit installation or substantially increase cost, plus specified contractor and insurance requirements.

The statute also provides an implied easement across common elements for installation and power supply, subject to its requirements. Section 718.113(9) permits association-operated shared stations and user charges.

Location matters. A space near your front door is not automatically your exclusively designated parking area. Confirm the property boundaries and parking rights before relying on the statute.

Source: Florida Statutes § 718.113(8)–(9). Counsel should review the proposed location and lawful conditions.

Can I install a charger outside my unit?

Possibly—but proximity to the unit is only one part of the analysis. A wall, lawn, walkway, or parking space may belong to the common elements or another entity. Determine the charging equipment’s location, cable route, power source, and the owner’s rights to the parking area.

Proposed arrangementWhat needs review?
Charger serving an exclusively designated spaceConfirm parking documentation and apply the statutory installation framework.
Equipment attached to an exterior wallWall ownership, attachment details, waterproofing, appearance, and the legal basis for that location.
Power routed across common propertyProfessionally designed route, easement provisions, permits, and protection of landscaping and building systems.
Charging in unassigned parkingNo assumption of an individual exclusive-space right. Explore a shared solution and obtain legal review.
Cord from a window or across a sidewalkTrip hazards, accessibility, weather exposure, electrical suitability, and emergency access. Use a professionally designed alternative.
Protect pedestrians. Charging cords should not obstruct routes used by residents with walkers, wheelchairs, or limited vision. Do not treat a loose cord or temporary cover as an approved permanent installation.

Do not begin drilling, trenching, or attaching equipment based on a verbal conversation alone. Use a documented proposal and coordinated review.

Safe charging starts with thoughtful planning.

Understand the charging options

Level 1: standard-voltage charging

Uses compatible equipment with a 120-volt supply. It is slower and may suit some driving patterns. An existing outlet is not automatically suitable for prolonged charging; have the circuit, outlet, protection, and outdoor conditions evaluated.

Level 2: installed charging equipment

Typically uses a 240-volt supply and charges faster. Installation may involve a new circuit, conduit, panel work, and load-management equipment. The right design depends on the vehicle, site, and available electrical capacity.

DC fast charging is a different infrastructure project and should not be assumed practical for a small association. Public charging can provide an alternative while a home installation is evaluated.

DOE multifamily charging guide ↗

A practical installation-review checklist

  1. Map the location and rights. Include the unit, parking space, mounting point, proposed cable/conduit route, and relevant parking documents.
  2. Use a qualified electrical contractor. Request a load assessment, equipment specifications, outdoor rating, protective features, and a plan for future charging demand.
  3. Confirm permits and inspections. Ask Palm Beach County’s Building Division what applies to the specific electrical work. Association approval does not replace governmental authorization.
  4. Explain how electricity is measured and billed. Identify the supply, meter arrangement, payment responsibility, and ongoing administrative costs.
  5. Review insurance and responsibility. Document maintenance, damage repair, restoration, removal, and applicable insurance conditions with the association’s advisers.
  6. Coordinate physical work. Plan access, outages, trenching, waterproofing, and restoration. Keep pedestrian and emergency routes usable.
  7. Keep the completed file. Retain approvals, permits, inspection results, contractor details, equipment information, and the agreement governing ongoing responsibilities.

These are recommended planning steps, not a substitute for the statute. Conditions should support a lawful, safe installation rather than become a disguised blanket ban.

Could the association install shared charging?

A shared station may suit a site with unassigned parking or several interested residents. Compare demand and total ownership costs before committing.

Have counsel confirm the decision and funding procedure. Verify who controls the land and electrical service; an association should not assume it can install equipment on property operated by another organization.

Fair access. Clear costs. Reliable maintenance.

Charging safety matters

If there is smoke, fire, or immediate danger, move away and call 911. Do not approach damaged charging equipment or attempt to handle an EV battery emergency yourself.

Source: U.S. Fire Administration EV charging safety. Site planning recommendations supplement the agency’s guidance.

Owning an electric vehicle does not resolve every charging or parking question. Review vehicle use and installation separately. E-bikes, scooters, and golf carts may involve different equipment and rules.

Questions residents often ask

Can I use a common-area outlet because I pay assessments?

Do not assume so. Get the power source, permission, metering, cost responsibility, and electrical suitability reviewed before use.

Does owning a charger guarantee a parking space?

No automatic guarantee should be assumed. Confirm the parking rights and any approved shared-station rules separately.

Are there community-wide charging stations already available?

This page does not inventory current Century Village stations. Confirm availability, access, payment terms, and operating status with the facility operator or a current charging network before relying on a location.

Can the board simply say “no chargers anywhere”?

A blanket approach can conflict with Florida’s protections for qualifying owner installations. Review the specific proposal and statutory conditions instead.

Official resources

Florida Statutes § 718.113 · Condominium charging installations.

DOE multifamily charging resources · Planning for condominiums and apartments.

U.S. Fire Administration · EV charging safety.

Palm Beach County Planning, Zoning & Building · Permit and inspection guidance.

Back to Property & Safety

Reviewed October 17, 2026. Educational guidance; obtain electrical, permit, insurance, and legal review for the proposed installation. No current Century Village charger locations are asserted.

Board Synergy recommended practice

Plan for the charger after installation

Keep the approved location, parking rights, electrical design, metering and billing arrangement, permit closeout, maintenance duties, insurance terms, and removal or restoration obligations in one file.

Use qualified electrical personnel for faults and changes. An installed charger does not authorize a different parking allocation, an unsafe cord route, or unmetered use of shared electricity.